Contents
2 SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS
6 NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
7 IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE
8 CONCLUSION AND RECOMMENDATION
Tables
Table 1 Contact Information of Key Personnel
Table 2 Main Construction Works carried out in the Reporting Period
Table 3 Air Quality and Noise Monitoring Locations
Table 4 Coordinates of Water Quality Monitoring Locations
Table 5 Summary of Water Quality Exceedance
Table 6 Observations and Recommendations of Site Audit
Table 7 Waste Generated by the Construction and Disposal Ground
Table 8 Status of submissions required under the EP
Figures
Figure 1 Location of Proposed Yuen Long Effluent Polishing Plant
Figure 2 Location of Construction Dust Monitoring Stations
Figure 3 Noise Monitoring Locations
Figure 4 Water Quality Monitoring Locations
Figure 5 Ecology Monitoring Locations
Appendix
APPENDIX A CONSTRUCTION PROGRAMME
APPENDIX B PROJECT ORGANIZATION CHART
APPENDIX C ACTION AND LIMIT LEVELS
APPENDIX D GRAPHICAL PRESENTATION OF MONITORING DATA
APPENDIX E EVENT AND ACTION PLANS
APPENDIX G IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES