Contents

EXECUTIVE SUMMARY

1          INTRODUCTION

2          SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS

3          LANDSCAPE AND VISUAL

4          LAND CONTAMINATION

5          SITE INSPECTION AND AUDIT

6          NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

7          IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

8          CONCLUSION AND RECOMMENDATION

 

Tables

Table 1             Contact Information of Key Personnel

Table 2             Main Construction Works carried out in the Reporting Period

Table 3             Air Quality and Noise Monitoring Locations

Table 4             Coordinates of Water Quality Monitoring Locations

Table 5             Summary of Water Quality Exceedance

Table 6             Observations and Recommendations of Site Audit

Table 7             Waste Generated by the Construction and Disposal Ground

Table 8             Status of submissions required under the EP

 

Figures

Figure 1           Location of Proposed Yuen Long Effluent Polishing Plant

Figure 2           Location of Construction Dust Monitoring Stations

Figure 3           Noise Monitoring Locations

Figure 4           Water Quality Monitoring Locations

Figure 5           Ecology Monitoring Locations

 

Appendix

APPENDIX A     CONSTRUCTION PROGRAMME

APPENDIX B     PROJECT ORGANIZATION CHART

APPENDIX C     ACTION AND LIMIT LEVELS

APPENDIX D     GRAPHICAL PRESENTATION OF MONITORING DATA

APPENDIX E     EVENT AND ACTION PLANS

APPENDIX F     WASTE FLOW TABLE

APPENDIX G     IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES

APPENDIX H     CUMULATIVE STATISTICS ON ENVIRONMENTAL COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS